제대로 예측했는데 왜 항상 시간이 부족할까? (Planning fallacy)

계획 오류를 극복할 수 있는 두 번째 방법은 무언가요?

“사전 부검을 (Premortem) 할 수도 있습니다. 사전 부검이란, 일어날지 모르는 사건이 일어났다고 가정한 뒤에 그 사건과 관련된 주변 정보를 구체화하는 것입니다. 즉, 우리가 시간을 앞서가 있다고 가정을 해 보고, 타임머신을 타고 미래에 가서 현재를 되돌아보는 것입니다”

*행동경제학개론
계획의 오류
– 일의 종류와 양의 측정과 시간의 부족 현상
#오페라하우스 설립 등 계획 오류의 실제 사례
– 계획 오류를 극복하기 위한 행동경제학적 방법
#주재우 교수 (국민대 경영학과)
#kbs1라디오 #라디오 #KBS라디오 #시사라디오 #KBS1Radio #성공예감이대호입니다 #성공예감 #이대호 #경제 #투자

***

Reference 1

Klein, G. (2007). Performing a project premortem. Harvard Business Review, 85(9), 18–19.

Premortem by Gary Klein @ Freakonomics Radio

Research conducted in 1989 by Deborah J. Mitchell, of the Wharton School; Jay Russo, of Cornell; and Nancy Pennington, of the University of Colorado, found that prospective hindsight—imagining that an event has
already occurred—increases the ability to correctly identify reasons for future outcomes by 30%. We have used prospective hindsight to devise a method called a premortem, which helps project teams identify risks at
the outset.

… Although many project teams engage in prelaunch risk analysis, the premortem’s prospective hindsight approach offers benefits that other methods don’t. Indeed, the premortem doesn’t just help teams to identify potential problems early on. It also reduces the kind of damn-the-torpedoes attitude often assumed by people who are overinvested in a project. Moreover, in describing weaknesses that no one else has mentioned, team members feel valued for their intelligence and experience, and others learn from them. The exercise also sensitizes the team to pick up early signs of trouble once the project gets under way. In the end, a premortem may be the best way to circumvent any need for a painful postmortem.

***

Reference 2

Roger, B., Dale, G., & Michael, R. (1994). Exploring the “planning fallacy”: Why people underestimate their task completion times. Journal of Personality and Social Psychology, 67(3), 366–381.

Tested 3 hypotheses concerning people’s predictions of task completion times: (1) people underestimate their own but not others’ completion times, (2) people focus on plan-based scenarios rather than on relevant past experiences while generating their predictions, and (3) people’s attributions diminish the relevance of past experiences. Five studies were conducted with a total of 465 undergraduates. Results support each hypothesis. Ss’ predictions of their completion times were too optimistic for a variety of academic and nonacademic tasks. Think-aloud procedures revealed that Ss focused primarily on future scenarios when predicting their completion times. The optimistic bias was eliminated for Ss instructed to connect relevant past experiences with their predictions. Ss attributed their past prediction failures to external, transient, and specific factors. Observer Ss overestimated others’ completion times and made greater use of relevant past experiences.

“In 1871, the colony of British Columbia agreed to join the new country of Canada on the condition that a transcontinental railway reach the west coast by 1881. In fact, because of the intervention of an economic depression and political changes, the last spike was not driven until 1885, 4 years after the predicted date of completion. Nearly 100 years later, in 1969, the mayor of Montreal proudly announced that the 1976 Olympics would feature a state-of-the-art coliseum covered by the first retractable roof ever built on a stadium. According to mayor Jean Drapeau, the entire Olympic venture would cost $ 120 million and “can no more have a deficit than a man can have a baby” (Colombo, 1987, p. 269). Because of economic problems, strikes, and other construction delays, the stadium roof was not in place until 1989, 13 years after the predicted date of completion—and cost $120 million by itself! Many people consider the Sydney Opera House to be the champion of all planning disasters. According to original estimates in 1957, the opera house would be completed early in 1963 for $7 million. A scaled-down version of the opera house finally opened in 1973 at a cost of $102 million (Hall, 1980).” (pg. 366)

One thought on “제대로 예측했는데 왜 항상 시간이 부족할까? (Planning fallacy)”

  1. – ‘신’이 가장 비웃으며 하는 말 인간 이것들이 계획을 세웠어~~!!!
    – 인생은 예상?의 일이 많이 발생하다보니 계획세워도 계획대론 안되죠 그래도 계획을 세우는게 낫죠
    – 계획이라는 단어에는 이미 오류나 지연, 실패라는 의미가 포함되어 있는 것 같아요
    – 벼락치기시험공부는 아이큐높은학생들의 습관이나 지금은 이큐가 높아야 살수있는 현실아닌가요?
    – 옛말에 하다 중도에 포기 할 바엔 시작도 마라 했는데 살아보니 뭐든 시작하고 도전해보는것이 아무것도 안하는것보다 낫더라구요
    – 계획대로 되면 모든 사람이 공부잘하고, 부자되겠죠 결국은 제대로된(성공할수 있는) 계획을 성실히 실행하는게 답인데…..어렵죠
    – 마이크타이슨이 얘기했습니다 누구나 계획은 있다 쥐어 터지기전까지는 이라고 ㅋㅋ 웃으며 오늘을 시작해요
    – 한국이 건설하면 계획내에 됩니다
    – 누구를 만나느냐 따라 다르죠. 친구냐 애인이냐 면담이냐 장보기 목욕하러 가느냐등등
    – 만날 남자가 누구인가요,?
    – ??생각해볼 지점 !!
    – 요즘 회귀컨텐츠가 유행인데 인생2회차 느낌이네요^^
    – 역지사지 라는거군요

답글 남기기

이메일 주소는 공개되지 않습니다. 필수 필드는 *로 표시됩니다

이 사이트는 스팸을 줄이는 아키스밋을 사용합니다. 댓글이 어떻게 처리되는지 알아보십시오.